The Evergreen Line project is an 11-km new rapid transit extension that will connect Lougheed Town Centre Station in Burnaby to Lafarge Lake-Douglas Station in Coquitlam (Vancouver Lower Mainland).
EGRT Construction
Springline Construction Services Ltd was the first contractor on site as part of the Evergreen Line Rapid Transit Project and maintained a constant presence on site since then. Works included construction of 1 km long MSE wall adjacent to CN railway and associated mass backfill and installation of a 3,650mm diameter CSP culvert in a highly sensitive Riparian Zone. Road construction, storm drainage, utility installation and relocation, electrical signalization as well as grading and paving were common components within successfully executed contracts.