61 km of highway, 37 km of a 4 lane highway and 12 interchanges. View Project
A replacement of the existing 50 year old water main. The installation of approximately 1,554 meters of 914 mm diameter pipeline in Delta BC. View Project
A replacement Water Main from North Burnaby to New Westminister, The Douglas Road replacement is approximately 2 km's long primarily along, McGill, North Rosser Avenue and Albert Street. View Project
The Mountain Highway Interchange provided Highway 1 access to better distribute traffic and relieve pressure at the other neighboring interchanges.
The Highway 1 Lower Lynn added a new Interchange to provide access to Highway 1 to relieve pressure at the Keith Road/Seymour Parkway and Main Street/Dollarton Highway interchanges. View Project
Trio featured a main intake and head pond and a tributary tap, flow will be diverted by the intake through the main penstock to two powerhouses, the construction of a new 28 megawatt run of the river hydroelectric dam. This project is located 80 km north west of Harrison Hot Springs View Project